When should you build your house?

House construction can also be done in winter.

Table of contents

Building your house is also a matter of season and weather. Save time, optimize time on site and respect construction deadlines therefore requires knowing how to plan all of the construction stages and a builder seasoned takes into account all the parameters and the advantages and disadvantages of each season to make the best decisions so that the house building takes place without incident.

 

How long does it take to build a house?

For a traditional house classic brick, the construction time is estimated between 10 and 15 months, from laying the first stone to delivery. For a timber house, the deadlines will be a little shorter, between 9 and 13 months, because many elements are prefabricated in the factory, which reduces the implementation time on site, particularly making it watertight and airtight.

To go further in this comparison between wooden house et masonry house, read the article: “  Brick or wooden house in the South-West? 13 points of comparison »

How long do the different stages of construction take?

Several stages follow one another during the construction of the house:
– Preparation of the site (1 to 4 weeks): earthworks, foundations, land development (connection to water, electricity, gas networks).
– Structural work (2 to 6 months). The construction of the walls, the frame and the roof are works that take place mainly outdoors and are therefore subject to weather conditions.
– Second work (3 to 9 months). This involves the installation of interior and exterior joinery, plumbing, electricity, heating, and insulation.
– Finishing touches (2 to 6 months): installation of floor and wall coverings, painting, installation of sanitary and kitchen equipment.

To learn about the key moments of a construction, read the article “ Building your detached house in the South West: the steps ».

The second work is a less restrictive stage.
Once the house is watertight and airtight, the structure is less susceptible to adverse weather conditions. However, high humidity sometimes slows down drying times.

Land search, building permit, what are the deadlines?

How long does it take to find land in the Southwest?

In a project of new house, the preliminary stages are also quite long. The search for land is very variable. Generally a well-established house builder in the South West will quickly find you one the land corresponding to your expectations, in your search area. This step can nevertheless vary considerably from a few weeks to several months depending on the budget and the availability of land.

How long does it take to sell land?

Overall, it takes 3 months between signing the promise of sale of land and the signing of the final deed of sale at the notary. It is then necessary to take into account obtaining the permission whose timeframe varies depending on the region and the town hall between 2 and 4 months. But very often, the sale includes a suspensive condition, that of obtaining the building permit. The time limit then lengthens and can be 5 to 6 months for the purchase of land subject to a suspensive condition.

To find the ideal land as quickly as possible, consult the article “ 10 questions to ask yourself when choosing the right building plot for your house ».

 

When is the best time to start your construction project?

Given the duration of all these steps, it is important to start the process early enough so that your building project takes place in the best conditions. Ideally, prospecting for land should begin between spring and early autumn. Not only will you benefit from pleasant weather conditions for viewings, but once the land is found and the sale is finalized, work will begin at the best time, so that the vast majority of construction takes place during the good weather.

Difficult, building a house in winter is not impossible.
Winter does not prevent the construction of the walls of the house.

Is it possible to build your house in winter?

If the different stages do not follow the ideal timetable of a new house construction project, don't panic though.

The disadvantages of winter construction

We often hear that a construction site should not take place in winter. Indeed, the conditions are not always optimal. Building in winter can present certain difficulties. Thus, site preparation (earthworks and foundations) can be delayed by a winter that is too harsh due to frost. Similarly, the structural work, which includes the construction of walls and the roof, can be significantly slowed down by snow or rain. The finishing work can also be impacted by poor weather conditions. Indeed, the humidity in the air can lengthen the drying times of certain tasks, for example (screed, laying tiles, etc.).

The advantages of building in winter

Although winter construction may seem daunting, it also has its advantages, especially in certain areas of the South West. Winters in the Landes, or on the Arcachon bay For example, they are often milder and less rainy than in other regions, which does not affect certain stages of construction, such as earthworks or foundations. In addition, construction companies are generally less busy, which can offer greater flexibility and ultimately not slow down deadlines at all.

What precautions should be taken when building in winter?

Builders know how to adapt to weather conditions. It's entirely possible for them to move construction forward under optimal conditions, provided they take certain precautions. By anticipating weather conditions, they know how to protect the site from adverse weather conditions to avoid delays. Finally, they adapt the house construction schedule to focus the most critical stages during periods of milder weather.

Building your house can be done at any time, provided you take precautions.
Summary table of construction stages according to the different seasons.

Build your house requires support above all custom made, by a professional capable of adapting the schedule to reduce construction time. He will also be able to advise you on the materials best suited to your project and your needs.

Discover the methods of maisons Sic in the article " The art of Site Monitoring with Maisons Sic : an innovative customer experience »