How to plan your home renovation?

Table of contents

Planning your home renovation is the key to successful long-term work. In what order should the work be carried out? What work is best done simultaneously? What time should be expected for each stage? Which craftsmen to call on? How to coordinate them? Embarking on renovation work alone is not an easy task. Here are some keys to making the right choices.

Plan the renovation: take inventory

Even if we want to decoration work, we must start with priority work, so that the house is water- and air-free and remains healthy in the long term. THE roofing work, foundations or framework are to be carried out as a priority. As well as plumbing and electricity. It is then necessary to understand how reduce energy consumption of the house (insulation, heating, ventilation, etc.). These priority works identified, we can consider transformations of the house to bring it up to date. By preventing future problems (flooding, cracks, infiltration, mold, etc.), carrying out the work in this order will save money in the long term.

Determine a budget, desires

Depending on the work to be carried out, then identify the budget that you can devote to this project in order to check, with the craftsmen, if the planned renovation is realistic, or if you need to find a financing from your bank. It's about making energy renovation work, or to transform your house to bring it up to your taste? Would you like to rearrange your interior to save space? Expand your house ? It's time to ask yourself the right questions, in order to start fresh.

Find out about the feasibility of the project

You dream of expanding your house, transforming your garage into a living room for example. This is a good way to save space, but do you have the right to do so? Local regulations do not always allow you to do everything on your land. Find out at the town hall about your possibilities in terms of construction on the land.

To find out more, read the article “ What administrative procedures for which extension project? ».

Plan the renovation to anticipate tomorrow’s needs

When considering renovations, we must not be satisfied with a short-term vision. Set up scaffolding to redo the roof for example may be the opportunity to do other work on the facade for example or the upstairs windows. Likewise, it is better to redo the insulation or create an extension to the house before change boiler to dimension the equipment as accurately as possible. Planning the renovation is essential if you do not benefit from the budget today, you can also anticipate certain future work to reduce costs. Thus positioning the networks of a future bathroom or an extension during a renovation allows the accommodation to be upgraded at a lower cost at the desired time (coming of a child, teleworking, etc.).

To learn more about this topic, see the article: “ Why build a scalable house in the South West? ».

Make a plan for your renovation

Expand your living room, create a tailor-made layout, redo your kitchen, get a new bathroom, build an extension… Each of these projects requires a precise plan. Working with a competent professional, both in layout, interior decoration and construction, helps you make the right choices. A renovation is an opportunity to review the interior circulation of the home, its opening to the outside, and see its brightness. A professional will help you understand the strengths, constraints and feasibility of your desires and will help you adapt the project so that it fits your budget.

To go further, read the article: House extension: the 11 key steps ».

Planning the renovation: which professionals to call on?

Any renovation requires a variety of professionals: tilers, painters, plasterers, masons, electricians, heating plumbers, etc. It is then necessary to request different quotes and, above all, establish a schedule with the different craftsmen involved to coordinate them. To plan the renovation, the easiest way is to call on a company with expertise in project manageras an Maisons Sic, a construction and renovation professional in the South-West who has in-house all the skills necessary for a quality renovation.

Renovation work, in the South West in Bordeaux
Electricity, changing windows, installing insulation, are works to be carried out in order before any finishing work.

Should I renovate before moving in?

When you buy an old house, it is not uncommon to want to bring it up to your taste or to current standards. Some work makes cohabitation difficult, and it is always more pleasant to enter a house ready to live in. However, this solution can add a lot to the final cost of a project, in terms of rental costs for temporary accommodation or bridging loan etc… Take advantage of the delays between promise to purchase and the signing of the sale of the house to make realize the plans, quote and establish the work schedule, in order to waste as little time as possible.

Living in a house under construction

This solution requires good organization, because the pieces will have to be moved as the work progresses. Renovate a home room by room allows you to suffer less from the constraints of the construction site. It is also possible to organize with the company so that the most disturbing or heaviest work (water and electricity cuts, absence of kitchen, demolition, etc.) in terms of dust and noise is carried out during a period of absence. This is the opportunity to combine business with pleasure by organizing a vacation before returning to your transformed home.

Renovation work: what order?

– Demolition and removal of old equipment:

The first thing to do is to remove everything that needs to be removed: old tiles, insulation, floor coverings and walls, etc.

– The structural work:

Construction of new partitions, the foundations of your house extension, roofing work but also changes or the installation of new windows will be important work which requires real know-how. These are also generally the most inconvenient jobs when you live there.

– Plumbing, electricity:

This work is part of the first elements to plan and implement to create efficient and as little visible networks as possible. The networks (heating, hot and cold water, electricity, ventilation)… will always find a place in formwork, false ceilings or hidden in grooves. They are carried out before insulation and plastering work to hide more easily.

 

Plan plumbing work
Plumbing work is part of the priority work because it sometimes involves a lot of finishing work.

– Second work/finishes:

This step will first concern the insulation work, the installation of plasterboards then all the decoration work of the house: floor and wall coverings. Laying a screed and tiling is work to be anticipated, particularly because of drying times and difficulties in crossing or using the rooms.

To go further, read the article: Home improvement: what trends in renovation? ».

Plan the renovation considering longer deadlines

Rare are the construction sites without unforeseen events. Always allow for margins in your organization to avoid disappointments. Finally, once the work is completed, don't forget that you still have to clean, reorganize all the rooms, and settle back into your new layout.

Renovate your house room by room

How long does it take to redo your bathroom?

Personalized bathroom renovation work can last approximately 10 to 15 days. But it all depends on the scale of the project. Bringing a bathroom up to date requires intervention both on the sanitary equipment as on tiling, furniture but also electricity and plumbing.

How long does it take to complete a new kitchen?

Have your kitchen redone may take time. Here again, many professionals are involved on the site. A radical change in layout, furniture, floor covering will obviously take a lot of time. If it only takes 10 to 30 days of construction work (laying and drying of tiling, installation of furniture, plumbing, electricity, etc.), it is also necessary to take into account the preparation of the project upstream: drawing up the plan, designing the furniture, its delivery. The project may therefore take three or four months.